New Case Study
A new Case Study has been added to the website. This can be viewed by clicking on the following link, or by going to the Case Study tab. ...
read more »
Tricky Cooler Lift
When one of our clients required a replacement cooler, it wasn't going to be an easy in and out. The new cooler (weighing over a tonne) needed to be lifted and installed 15m up in the air, in a live cold store environment. Because of this there were not suitable forklift and ...
read more »
New Condenser
Out with the old and in with the new. A new Adiabatic Condenser was craned into place this week for one of our clients. Not an easy project, with the old one needing to be removed. The lift was inexcess of 15m, but fortunately the weather was kind. ...
read more »
Three New Compressors
Three new Sabroe compressors have now been installed for one of our clients, as replacements for three older systems. Two are fully operational with the third currently being commissioned. The work was carried out to ensure the least amount of impact on our clients business. ...
read more »
Compressor Overhaul
Another excellent compressor overhaul from our Service Team. Working with the client we made sure everything was carried out safely and efficiently. And a nice little paint job at the end. ...
read more »